Award

October 2019

Issue link: http://digital.canadawide.com/i/1174518

Contents of this Issue

Navigation

Page 52 of 79

OCTOBER 2019 | 53 PHOTOGRAPHY COURTESY INHOUSE BY BEAVERBROOK Andre Lema, manager of busi- ness development at Western Archrib (which fabricated all the wood compo- nents for the three-storey structure), says, "The process to construction had to be quite interactive in order to get it right for Beaverbrook. Once underway, all the preplanning and prefabrication paid off, as the building went together like a set of Lego." The orientation of the two structures allowed for a central south-facing urban plaza to be developed, with an overhang to allow future cafes and restaurants to expand outside during the summer months. "A feature canopy trellis infills the walkway between the two buildings and wraps around to become the entry to the residential tower," says Osborne, adding that an internal street with a drop-off and roundabout was created for the entrance. InHouse by Beaverbrook secured rezoning for the development in March 2016, and Pagnotta Industries Inc. broke ground on the site in May 2017. Osborne says, "All renovations are challenging, but everyone involved in this project came together as a true team, from the builders to the struc- tural and geotechnical engineers." Fereday concludes, "Right now we're sourcing a mix of local and indepen- dent businesses for West Block's retail/ commercial component, to ensure that it becomes a true destination in Edmonton. The finished product looks exactly like the renderings, which aimed for high quality at every turn, and we're extremely happy with the outcome." The office space is almost fully leased due to the unique features of the project. A LOCATION 142 Street and Stony Plain Road, Edmonton, Alberta OWNER/DEVELOPER InHouse by Beaverbrook ARCHITECT GEC Architecture GENERAL CONTRACTOR Pagnotta Industries Inc. STRUCTURAL CONSULTANT (CONCRETE) Protostatix Engineering Consultants STRUCTURAL CONSULTANT (MASS TIMBER) ISL Engineering MECHANICAL CONSULTANT Reinbold Engineering Group ELECTRICAL CONSULTANT Arrow Engineering Inc. INTERIOR DESIGN Jennifer Jordan Interior Design TOTAL SIZE 210,000 square feet TOTAL COST $85 million West Block 8:09 AM 12:07 PM 9:15 AM Congratulations to Beaverbrook Developments and InHouse! Proud to be part of the team on the West Block project. MAP_AWARD_1019.indd 1 9/27/19 9:22 AM Quality & Integrity for Over 30 Years • Wall Systems • Load Bearing Steel Stud • Composite Floor Systems • Acoustic Ceilings #205 Turbo Drive, Sherwood Park, Alberta www.kdhdrywall.ca Phone: (780) 416-8668 Proud to be a part of the West Block Project KDHDrywall_AWARD_1019.indd 1 9/24/19 7:51

Articles in this issue

Links on this page

Archives of this issue

view archives of Award - October 2019