Award

December 2016

Issue link: http://digital.canadawide.com/i/755184

Contents of this Issue

Navigation

Page 17 of 87

© 2016 Maxxon ® Corporation, all rights reserved. To learn more: 800-356-7887 info@maxxon.com • www.Maxxon.com Maxxon's SMART System addresses moisture vapor emissions and floor flatness frustrations common in new high-rise concrete construction. With the moisture mitigation and self-leveling technology of the SMART System, even the most demanding construction timeline can still be met. The SMART System: • Reduces moisture vapor emission rates of up to 25 lbs to 3 lbs or less • Level-Right ® Maxx provides a smooth, flat surface ready to receive virtually any floor covering • Floor goods can be installed in as little as 24-48 hours after Level-Right Maxx is installed. • Full system warranty • Helps keep projects on schedule • Can be poured to the top floor of even the tallest buildings MAXXON'S NEW GET PUMPED UP FOR THE SMART APPROACH TO CONCRETE CONSTRUCTION SYSTEM Slab Moisture and Resurfacing Technology + Peri Formwork Systems.indd 1 2016-11-07 1:29

Articles in this issue

Links on this page

Archives of this issue

view archives of Award - December 2016