Award

August 2016

Issue link: http://digital.canadawide.com/i/713703

Contents of this Issue

Navigation

Page 68 of 95

AUGUST 2016 | 69 Energy conservation played a big role at the school, where direct and indirect lighting was used in addition to natural light. "We used LED lighting in the educational spaces, which is more energy efficient, uses less watts and has less cost and maintenance," says Dick Ong, principal at JO Engineering Inc. "The fixtures in the flex space are also different from standard lights with occupancy and daylight sensors adding to the energy savings." Mike Nowlan, engineering manager, structural group at Williams Engineering Canada, says like other schools in the area, a special structural aspect includes having an open web steel joist main floor instead of a suspended slab. "This is helpful in areas that have a lot of clay in the soil. It is more expensive than slab-on-grade, but it provides a more stable base." Bill Temple, mechanical engineering manager at Williams Engineering Canada, says the LEED Silver requirements at St. Mary included 11 out of 19 energy points, which is 42 per cent better than the national energy code: "We are required to provide an energy simulation as part of our scope of work to meet the government's mandate." St. Mary's original school is slated for demolition in the summer of 2016. A LOCATION 13th Street and 5th Avenue, Beaverlodge, Alberta OWNER/DEVELOPER Grande Prairie Catholic School District ARCHITECTS Workun Garrick Partnership (Bridging Architect) ACI Architects Inc. (Architect of Record) GENERAL CONTRACTOR Jen-Col Construction Ltd. STRUCTURAL/MECHANICAL/ CIVIL CONSULTANT Williams Engineering Canada ELECTRICAL CONSULTANT JO Engineering Inc. TOTAL SIZE 29,590 square feet TOTAL COST $15 million PHOTOGRAPHY COURTESY GRANDE PRAIRIE CATHOLIC SCHOOL DISTRICT St. Mary Catholic School 1 2 - 5 2 5 1 0 R a n g e R o a d 2 6 3 A , A c h e s o n , A B T 7 X 5 A 6 7 8 0 - 9 6 3 - 6 5 2 3 www.jen-col.com We Strive to Deliver an Unrivaled Project Experience Jen-Col Construction is the proud builder of the new Robert W. Zahara School in Sexmith and the St. Mary Catholic School in Beaverlodge Jen-Col.indd 1 16-07-28 9:58 AM Proud to be part of the St. Mary Catholic School project! Grande Prairie | Fort St. John | Peace River | 780-532-9350 | www.overheaddoorgp.com Overhead Door Co. of Grande Prairie Serving the Peace Since 1973 Overhead Door.indd 1 16-07-25 3:28 M&L PAINTING 1999 LTD. Painting Wallcovering Specialty Coating Line Painting Proud to be a part of the St. Mary Catholic School project. 5B - 421 East Lake Rd. NE Airdrie AB T4A 2J7 tel: 403.912.2639 Fax: 403.912.2641 M_L Painting.indd 1 16-07-15 10:32 Flynn Canada.indd 1 14-11-07 3:20

Articles in this issue

Links on this page

Archives of this issue

view archives of Award - August 2016