Award

October 2014

Issue link: http://digital.canadawide.com/i/396142

Contents of this Issue

Navigation

Page 70 of 95

renderings courtesy Bing thom Architects / shAPe Architects / isAAc ePP Guildford Aquatic Centre by Jessica Krippendorf A beautiful new aquatic centre has created a visual gateway for visi- tors to Surrey's Guildford com- munity in B.C., and a recreation and therapeutic aquatic destination for community residents. Combining a leisure pool, walking lanes, a lazy river and a toddlers area with a FINA-certified, 50-metre lap pool, the Guildford Aquatic Centre serves one of the City's primary goals for the proj- ect – a welcoming, inclusive facility for people of all ages and abilities. Scott Groves, manager of Civic Facili- ties for the City of Surrey, says the City's vision was to create a community hub for Guildford Town Centre. "Due to this prominent location, we also looked for a high level of architecture, both to greet first-time visitors and to make the local neighbourhood proud," says Groves. The expansion includes 2,600 square feet of enlargement to the fitness centre, new entries with a lobby and adminis- trative space, an access bridge overlook- ing the natatorium, a sauna, steam room and change area, plus 300 fixed specta- tor seating with direct views into the natatorium. The design takes into account the energy consumption of pool buildings and reduces the impact of heat gained from direct sunlight with selective and strategically placed glazing. "A ribbon of glazing is located at pool deck level," says Michael Heeney, principal with Bing Thom Architects (BTA). "It opens up the lower corners of the natatorium box and will reveal the white pearl interior." The lightness of the glazing ribbon and white interior palette contrasts with pixelated grey tones of exterior precast panels, with the intention to "provide a tension of materials and a play between solid and void," says Heeney. The design takes advantage of the building's low setting on the site, using the concrete panels, landscaping and a stormwater retention pond to create the image of the earth evolving into a build- ing encircled by greenery. "Surrounded by two main streets, the facade needed to be animated," says Heeney. "For budget reasons, we could only have a limited number of panel sizes, however, we created two- dozen panel types using four different pigments in concrete mix and two dif- ferent degrees of sandblast finish. The result is a highly varied pixelated grey toned facade that gives a new face to the Guildford Community Centre complex." Alec Smith, architect with Shape Architecture, associate architect on the project, says his firm's primary focus was the aquatic components and change rooms. "The exterior form and com- ponent was meant to be striking and notable, while Bing Thom conceived the interior as a 'magic box' lit from above," says Smith. "The design works around a theme of the interaction between light and water to create a glowing, luminous interior." Smith adds that the lap pool had very specific technical and intense lighting requirements in order to be suitable for televised competitions. "It is a challenge to hang large, artificial lighting in a pool space because of logistical access prob- lems," says Smith. The BTA design team worked inten- sively with StructureCraft Builders to create a sustainable hybrid wood truss system known as laminated strand timber that acts as the main natato- rium roof structure and contains the mechanical systems, acoustical damp- ening system and sprinklers, while also housing enough lighting to meet the 600-lux requirement. Mehrdad Jahangiri, senior structural engineer with Fast + Epp, structural engineers for the project, designed the 22 repeating wood, V-shaped trusses, which were prefabricated and installed with the services in place by Structure- Craft Builders. "This allowed for rapid on-site assembly with no scaffolding," says Jahangiri. "The design approach taken by the team to use wood trusses has many benefits, among them corro- sion resistance, ease of maintenance, and the fact that wood is renewable and sequesters carbon." The tall concrete perimeter walls, characteristic of pool buildings, meant particular care had to be taken regard- ing the interaction of the roof and walls under seismic loading, with the concrete walls providing shear resis- tance for the roof and the wooden roof providing out-of-plane support for the concrete walls. "This interaction is particularly important at the southeast corner of the natatorium, where there is a large glazed opening with no corner column. Each wall cantilevers 30 feet to the cor- ner of the building," says Jahangiri. David Chung, electrical designer with Applied Engineering Solutions, says the lighting system in each truss consists of two rows of f luorescent vapour proof luminaires. "A vapour proof enclosure was cho- sen for its long service life in chlori- nated environments," says Chung. "A lamp type of T5HO was selected for its ability to provide soft, bright and direc- tional lighting, and by using computer modelling, specular reflectors, special mounting brackets and high-reflectivity paint, competition lighting levels were achieved." On the ground plane, the pools and a translucent, spiralling water slide positioned below one of the skylights continue the design theme. "The theme of interaction of water and light is the driving force behind the esthetic of the pool components, instead of simply rely- ing on colour or material," says Smith. C lever desig n solut ions were required as the team was challenged by the building site – poor soil conditions, varying grades and the requirement to accommodate large volumes of storm- water – all exacerbated by the need to construct the building while the exist- ing busy facility stayed operational. The northeast corner of the site was at one point a ravine and had been filled, resulting in loose soils. Rather than excavate and refill the area with structural soil, the design team sug- gested it as the location of a two-level parkade, simultaneously solving the issue of insufficient parking. The soil conditions were also a problem in that several long-spanning concrete, wood and steel elements in the building superstructure meant sig- nificant load accumulation at points where bearing was designed to transfer down to the foundation. "A finite element model of the entire natatorium and parkade was built so we could quickly quantify the stresses imposed onto the foundations while optimizing the footing design along with other structural elements," says Jahangiri. "The model not only allowed for rapid evaluation of geometry changes during design, but also allowed for accu- rate assessment of co-ordination items during construction," he concludes. ■ Location 15105 - 105 Avenue, Surrey, B.C. owner/DeveLoper City of Surrey Design architect/prime consuLtant Bing Thom Architects associate architect Shape Architects generaL contractor Heatherbrae Builders Co. Ltd. structuraL consuLtant Fast + Epp mechanicaL consuLtant AME Consulting Group eLectricaL consuLtant Applied Engineering Solutions totaL size 75,000 square feet totaL construction cost $32.8 million october 2014 /71 Guildford Aquatic centre 10:27 AM 4:06 PM 10:33 AM 10:46 AM

Articles in this issue

Archives of this issue

view archives of Award - October 2014