Award

February 2014

Issue link: http://digital.canadawide.com/i/255439

Contents of this Issue

Navigation

Page 46 of 87

Arguably the most impressive feat construction-wise was Aspac's determi- nation to provide underground parking for residents – something that has never been done in the City of Richmond. "We essentially built a waterproof tank two- and-a-half-storeys below grade and well below the water table," says Ryan. To make this work, Ledcor designed a dewatering system that continuously removed water during excavation (the first system of this scale used in Richmond); it also installed the larg- est waterproofing membrane in North America and presided over the largest concrete pour in the company's history. With Phase One approximately 80 per cent sold out, Ryan's attention has already turned to Phase Two, an urban village designed by IBI Group. River Green is a legacy development in the truest sense of the term, and Ryan credits Richmond for supporting Aspac's vision. "Its goal to be known for livable and sustainable communities coincides with our mandate for future development," he says. As for Cheng, he reiterates that despite River Green's enormity, thoughtful consideration about what makes a true community was the most important part of his job: "River Green will be here for 100 years or more, so that's why we wanted to get every detail right, from the beginning." ■ ADDRESS 5171 Brighouse Way, Richmond, B.C. OWNER/DEVELOPER Aspac Developments Ltd. PROJECT MANAGER Jakin Engineering and Construction Ltd. ARCHITECT James K.M. Cheng Architects Inc. CONSTRUCTION MANAGER Ledcor Construction Ltd. STRUCTURAL CONSULTANT Jones Kwong Kishi / Dialog MECHANICAL CONSULTANT Yoneda & Associates ELECTRICAL CONSULTANT Nemetz (S/A) & Associates Ltd. GEOTECHNICAL CONSULTANT GeoPacifi c Consultants Ltd. CIVIL CONSULTANT Aplin & Martin Consultants LANDSCAPE CONSULTANT Phillips Farevaag Smallenberg (PFS) Studio INTERIOR DESIGN Trepp Design Inc. TOTAL SIZE 700,000 square feet TOTAL COST $370 million Courtesy AspAC Developments ltD. february 2014 /47 river Green – Phase One p44-47River Green.indd 47 14-01-22 11:01 AM

Articles in this issue

Archives of this issue

view archives of Award - February 2014